Waste water treatment equipment
Design and construct the optimum system for all users from scratch
When creating wastewater treatment equipment, the most important thing is to accurately grasp the wastewater that differs for each customer.
Step.1 Research
The first thing to do is a detailed check of how wastewater is discharged from the manufacturing process. Analyze wastewater as needed.
We carefully discuss with the customer the purpose and priorities for introduction, such as investment amount, running cost, installation space, etc.

Step.2 Proposal
We will make a proposal in consideration of the results of the survey and the customer's request. And make clear the treatment flow, Layout plan, Cost estimation, Running cost, Processing system control, etc. We will also explain how it has advantages over other methods.
-1024x705.png)
Step.3 Design
After receiving an order, we will design the equipment in detail and select the equipment.
Basically, in order to provide the most suitable system for our customers, we do not sell ready-made products, but design them to order each time.
-1024x705.png)
Sep.4 Manufacturing
Our factory owns shearing machines, press brakes, bending rolls, etc. And designed tanks and equipment are manufactured at our own factory.